During the public consultation, we showed connections to the recently built footpath and cycleway along the eastern boundary of our site because we wanted to stitch into the existing network and make it easier for neighbours to access the play area and open spaces on our site and beyond.

For planning, we have removed the southernmost connection and shown the other as an indicative connection that can be established if deemed desirable in the future.